Case Story Bisio Progetti
Leave your system as it is now. Frigel will improve it by only changing your approach to cooling. Synchro your cooling system with your mould and save money!
The Goal
As the market leader in mould cooling innovation, Frigel was called in by Bisio Progetti to increase their productivity and maximize profitability of their installed injection molding machines. The goal was to reduce production cost and significantly increase productivity of the injection molding machine.
A game changer
Every new challenge starts with a “paradigm shift”. Frigel has been in the market leader in precision cooling since ’60. In 1994 Frigel changed the approach to mould cooling with “Microgel Technology”, which brings the cooling machine next to the mould. By doing that, customers have been able to achieve the best cooling in relation to temperature, flow rate and pressure. 20 years later we’re raising the bar again: Synch cooling with injection molding phases.
Results and achievement
The experience was completed in cooperation with a Bisio project injection moulding machine expert and the Frigel Syncro field team. The previous cooling system was a standard TCU the same cooling temperature to the 2 halves of the mould (stationary and moving). To test the improvement of the cooling system, we selected new model RSY 80 equipped with:
- Flow meter, for perfect cooling control
- Communication with the injection moulding machine
- Syncro logic software
Following a schematic and simple procedure, the customer found the best setup for Microgel Syncro and injection molding machine, achieving remarkable results:
- Production increased +28,5%
- Cycle time decreased -27,5%
How much time did it require? Just 3 hours! What else? It is the return of time invested in the start-up: it happened in the same day!
Less time, less energy
Another incredible result was the reduction of power consumption in Syncro mode compared to the standard cooling mode. In one working hour, the consumed power was reduced by 18% compared to standard working mode.
Even though the test had achieved excellent results, Bisio Progetti decided to make an additional test: bringing back the cooling to the original technology and using the new injection moulding machine setup to reduce the cycle time. Even with the new injection setup, the cycle time was not possible to be reduced compared to the original time obtained with the original cooling unit.
![](https://www.frigel.com/assets/img/news/Frigel_case_Bisio_Syncro_image01.png)
Conclusions
The use of this technology clearly established these benefits:
- Cycle time was reduced, generating a 30% increase: of productivity
- Start-up time was similar to the original unit: 3 hours
- Easiness to synchronize the unit to the process
- Power consumption was reduced by 18%, resulting in a decrease of kWh/kg of resin.
For more information